Sala de prensa
Sala de prensa

Grid-connected power from ALTER ENERSUN

OCTUBRE 2012.

Alter Enersun owns 1.50% photovoltaic power installed on the roof of Spain with its 6.56 MW (Unef reports, data from CNE and MINETUR)

UNEF_Pot_Conectada_Red_Estadisticas_CNE_agosto_2012

Alter Enersun completes the works on the La LUZ solar park in Huelva
Alter Enersun is developing 1000 MW of photovoltaic and wind energy to supply the grid and hydrogen projects in Huelva
Alter Enersun obtains financing of 160 million euros for the construction of photovoltaic plants