In 2023 Alter Enersun has launched a photovoltaic installation located in the Extremaduran municipality of Jerez de los Caballeros, that will generate approximately 22 GWh per year, which will cover the energy needs of more than 5,000 families.
It is a plant with 11.98 MWp of power and about 22,000 modules in total.